thevelvetrock
New member
TOS Keltner Channel study defaults the ATR (Average True Range) time period to the selected look-back time period. It would be useful to be able to choose a different ATR time period. I've read the code, but don't have the skills to create an ATR with a separate time period. For example, StockCharts allows three inputs: Lookback period, ATR period and multiplier. I find using separate time periods improves TTM Squeeze Pro significantly. Need help converting the TOS Keltner Channels study code.